Logo

Entertainment

Health

Home Remedies

News Papers 

  

General Knowledge

Our Youtube

Railway Employee

Railway

Mutual  Transfer

Railway

Question Bank

Railway

Departmental Exam 

Rail Employee 

YouTube  

Railway News 

Railway

Rules & Books

Railway

Circulars & Order

Retirment

& Pension

Railway

Manuals & Codes 

Railway

Study Material

Railway

Telephone Directory

 

 

Follow Us on WhatsApp Channel

Rail News Center (Rail Employees & Users)

 

 

ENGINEERING (P WAY) - STUDY MATERIAL 

(Civil Engineering Department  Railway) 

(Hindi & English)

 

 SYLLABUS - LDCE Group 'B' of ADEN/AEN 

 Engineering (P Way / Works) Department Study Material Question Bank

Question Answer & Short Notes For LDCE & Dept. Exam - P Way

 

SPECIAL

 Type & category of encroachments in Railway & division fixation of responsibility for encroachments

 Action plan for prevention and removal of encroachments from Railway land

 

INDEX - ENGINEERING(P WAY) INDIAN RAILWAY (HINDI)

Definitions (परिभाषाएँ)

Railway Organisation & Civil Engineering
P Way - Welded Rail Related Definitions

 

Duties (कर्तव्य)

Duties of JE /SSE / P Way (Other Than Sectional Or In-Charge)

रेल पथ पर्यवेक्षक - मेट व चाबीदार के कर्तव्य

रेलपथ निरक्षक तथा सहायक मंडल अभियंता के कर्तव्य

E01.02 Duties of Keyman

 

 रेलों का परीक्षण Way (रेलपथ)
Permanent Way
E02.03 Defects in Rails
E02.05 Rail Temperature

02.05 रेल जोड

E02.05 Rail Temperature

02.06 रेल जोड़ो का अनुरक्षण

E02.07 Maintenance of Rail Joints
E02.02 Handling of 90 UTS rails
Methods to insulate the track circuited section

 

Sleepers (स्लीपर)
E03.01 Sleepers & Fastenings - Functions of Sleepers
 E03.02 Comparison between Various Types of Sleepers
 E03.04 Laying of Sleepers

03.03 स्लीपर बिछाना

 E03.04 Laying of Sleepers

 

स्लीपर तथा फास्टनिंग - स्लीपरों के कार्य

 

 

 

E04.01 Ballast

04.01 ट्रैक के लिए बैलास्ट प्रोफाइल

E04.02 Ballast Profile for L.W.R. track

04.02 फार्मेशन

E04.03 Formation
E04.04 Bridges
 E06.01 Basics of Curves

E06.02 Realignment of Curve

 

Points and Crossing (पाइंट्स तथा क्रासिंग)
 E05.01 Points & Crossings: Introduction & Definitions
E05.02 Special Layouts
E05.04 Maintenance and Inspection of Points and Crossing
 E05.05 Reconditioning of Points and Crossing

 

 

..

 

Patrolling (पेट्रोलिंग)

Patrolling & Its Type

Duties of Patrolmen (Hindi / English)

Preparation of Patrol Charts – Short Note

 



 08 थू पैकिंग  E08.01 Maintenance of Track -Through packing
E08.02 Systematic Overhauling
 08.02 रेलपथ अनुरक्षण का वार्षिक कार्यक्रम E08.03 Annual Programme for Regular Track Maintenances
E08.05 Deep Screening

E08.06 Short Welded Rail

E08.07 Maintenance of SWR

E08.08 ON Track Machines
E08.09 Small Track Machines

E08.10 Level Crossing

E08.11 Equipments at Level Crossing and Duties of Gateman

E08.12 Maintenance / Examination / Inspection of Level Crossing / Gate

E08.14 Welding of Rails
E08.13 Height Gauges on Electrified Section
E08.15 Records of Material under Trial (As per Cs.no 99)

 

 

E10.01 Inspection of Track - Object of Inspection
 
E10.02 Riding Quality and Riding Index
E10.03 Track Recording and Oscillograph Car
E10.04 CTR and TGI Value
E11.01 RENEWAL - Permanent Way Renewal
E11.02 Laying of Sleepers

12 दुर्घटना

E12.01 Accidents& Breaches - Accidents

 12.01 ब्रीच

E12.02 Breaches

12.02 डाईवर्शन

E12.03 Diversion

ट्रैकसर्किटेड क्षेत्र में कार्य करते समय सावधानियाँ

E13.01 Maintenance in Track Circuited / Electrified Area
E13.01 Precaution to be taken during works in electrified area

 

 LWR/CWR (एलडब्लूआर / सीडब्लूआर)
E14.02 Permitted locations for LWR/CWR
E14.03 Destressing of LWR

E14.04 Maintenance of LWR / CWR

E14.05 DOs and Don’ts OF LWR For PWM

 

 कांक्रिट स्‍लीपर के फायदे और कांक्रिट स्‍लीपर मेँ कमियाँ
Safe Working of Contractors (As per Cs.No 95)

  

 Short Notes / Answer - P WAY

  Preparation of Patrol Charts

Track Tolerances for BG Track

Repair of Rail Fracture

Criteria for Rail Renewal 

 Action on Check Rail is Broken at Level Crossing

Buckling of Track in LWR territory & its remedial measures 

Consolidation of track in LWR

Reconditioning of CMS crossing 

Void Ratio Degree of Saturation 
Maximum dry density & Optimum moister content

Safe bearing capacity 

Porosity

Active Earth Pressure & Passive Earth Pressure

 Cohesive and non cohesive soils Atterberg limits 
 Design mode working of CSM

Anti corrosive treatment of plate/rail screw

 

Handling of 90 UTS Rails

Renewal of Rail On Major Bridges & Their Approaches  
 List out work required CRS sanction before execution at site 

Short Notes / Answer - WORKS

 Water cement Ratio

Static & Pumping Water Level

Leaky Roof Treatment

Basic Passenger Amenities 

Pre and post stressed concrete structure

Initial & Final Setting time of Concrete 

 Workability of Concrete

 Curing of Concrete

Fineness modulus

 

MISC.

BOT / BOOT Schemes

 

 

 

 

  ALSO SEE